Roca Mines Inc.










Previous All pages Next 1 2 3 4 5 6 7 8 9 in  columns
--
::
--
First Moly Concentrate Shipment from MAX Mine
163 KB, approx. 31 seconds at 56.6Kbps
--
::
--
First Moly Concentrate Shipment from MAX Mine
64 KB, approx. 13 seconds at 56.6Kbps
--
::
--
First Moly Concentrate Shipment from MAX Mine
40 KB, approx. 8 seconds at 56.6Kbps
--
::
--
First Moly Concentrate Shipment from MAX Mine
42 KB, approx. 9 seconds at 56.6Kbps
--
::
--
MAX Flotation at work
126 KB, approx. 24 seconds at 56.6Kbps
--
::
--
MAX Flotation cell
152 KB, approx. 29 seconds at 56.6Kbps
--
::
--
Roca's O'Grady, Skerlec, Broughton and Mirko receive CMEBC Award
140 KB, approx. 27 seconds at 56.6Kbps
--
::
--
MAX Robin Fraser bagged MoS2 Concntrate
221 KB, approx. 42 seconds at 56.6Kbps
--
::
--
MAX Bagged MoS2 Concentrate
246 KB, approx. 47 seconds at 56.6Kbps
--
::
--
MAX Filtering MoS2 Concentrate
196 KB, approx. 37 seconds at 56.6Kbps
--
::
--
MAX Filtering and Bagging Mos2 Concentrate
276 KB, approx. 52 seconds at 56.6Kbps
--
::
--
MAX Filtering MoS2 Concentrate A
284 KB, approx. 54 seconds at 56.6Kbps
--
::
--
MAX Robin Fraser and Kevin Ehman bagging MoS2 Concntrate
194 KB, approx. 37 seconds at 56.6Kbps
--
::
--
MAX Mill Sampling
412 KB, approx. 1 minute, 18 seconds at 56.6Kbps
--
::
--
MAX Aerial Site 3
363 KB, approx. 1 minute, 9 seconds at 56.6Kbps
--
::
--
MAX Flotation Cell 2
348 KB, approx. 1 minute, 6 seconds at 56.6Kbps
--
::
--
MAX Aerial Site
358 KB, approx. 1 minute, 8 seconds at 56.6Kbps
--
::
--
MAX Flotation Cell
381 KB, approx. 1 minute, 12 seconds at 56.6Kbps
--
::
--
MAX Flotation Cells
361 KB, approx. 1 minute, 8 seconds at 56.6Kbps
--
::
--
MAX Aerial Site 2
330 KB, approx. 1 minute, 2 seconds at 56.6Kbps
--
::
--
MAX MoS2 flotation concentrate
213 KB, approx. 41 seconds at 56.6Kbps
--
::
--
MAX Robert Jomphe and regrind mill
93 KB, approx. 18 seconds at 56.6Kbps
--
::
--
MAX Mill in operation
55 KB, approx. 11 seconds at 56.6Kbps
--
::
--
MAX Ball Mills
61 KB, approx. 12 seconds at 56.6Kbps
--
::
--
MAX Fine ore feed to Mill
81 KB, approx. 16 seconds at 56.6Kbps
--
::
--
First cons October 29, 2007
99 KB, approx. 20 seconds at 56.6Kbps
--
::
--
First cons October 29, 2007
82 KB, approx. 16 seconds at 56.6Kbps
--
::
--
First cons October 29, 2007
75 KB, approx. 15 seconds at 56.6Kbps
--
::
--
MAX Long Hole Production Drill
236 KB, approx. 45 seconds at 56.6Kbps
--
::
--
Frank O'Grady and John Mirko
241 KB, approx. 46 seconds at 56.6Kbps
--
::
--
MAX Visitors Trevor Torzsas(l) and John Hughes(r) with Frank O'Grady
129 KB, approx. 25 seconds at 56.6Kbps
--
::
--
Picture 91
42 KB, approx. 9 seconds at 56.6Kbps
--
::
--
Concentrate Filter Testing and Commissioning
146 KB, approx. 28 seconds at 56.6Kbps
--
::
--
Flotation Cell Testing and Commissioning
151 KB, approx. 29 seconds at 56.6Kbps
--
::
--
Concentrate Thickener Testing and Commissioning
118 KB, approx. 23 seconds at 56.6Kbps
--
::
--
Flotation Area Testing
144 KB, approx. 28 seconds at 56.6Kbps
--
::
--
No. 2 Mill Motor Replacement
131 KB, approx. 25 seconds at 56.6Kbps
--
::
--
No. 1 Mill Commissioned
151 KB, approx. 29 seconds at 56.6Kbps
--
::
--
Transfer Station Looking East
222 KB, approx. 42 seconds at 56.6Kbps
--
::
--
No. 1 Belt to Transfer Tower
254 KB, approx. 48 seconds at 56.6Kbps
--
::
--
No. 1 Belt to Transfer Tower
208 KB, approx. 40 seconds at 56.6Kbps
--
::
--
Loading Rock From Apron Feeder to Jaw Crusher
209 KB, approx. 40 seconds at 56.6Kbps
--
::
--
Crushed Rock on No. 1 Belt
230 KB, approx. 44 seconds at 56.6Kbps
--
::
--
Coarse ore bin September 2007
63 KB, approx. 13 seconds at 56.6Kbps
--
::
--
Crusher conveyors September 2007
73 KB, approx. 15 seconds at 56.6Kbps
--
::
--
Mill and Crusher August 2007
86 KB, approx. 17 seconds at 56.6Kbps
--
::
--
Mill flotation floor September 2007
104 KB, approx. 20 seconds at 56.6Kbps
--
::
--
Mill September 2007
99 KB, approx. 19 seconds at 56.6Kbps
--
::
--
No3 conveyor from crusher
69 KB, approx. 14 seconds at 56.6Kbps
--
::
--
Tour by U of S Students
110 KB, approx. 21 seconds at 56.6Kbps
--
::
--
Transfer Tower
91 KB, approx. 18 seconds at 56.6Kbps
--
::
--
Ug Miner September 2007
85 KB, approx. 17 seconds at 56.6Kbps
--
::
--
Visitors to the MAX Molybdenum Mine
101 KB, approx. 20 seconds at 56.6Kbps
--
::
--
Miners unloading ore cars
100 KB, approx. 20 seconds at 56.6Kbps
--
::
--
Stope development on 925L
249 KB, approx. 47 seconds at 56.6Kbps
--
::
--
South Dam filter zone construction
129 KB, approx. 25 seconds at 56.6Kbps
--
::
--
South Dam construction
261 KB, approx. 50 seconds at 56.6Kbps
--
::
--
View to South Dam
164 KB, approx. 32 seconds at 56.6Kbps
--
::
--
North Dam construction
203 KB, approx. 39 seconds at 56.6Kbps
--
::
--
North Dam construction
192 KB, approx. 37 seconds at 56.6Kbps
--
::
--
Placing Rockfill on North Dam
218 KB, approx. 42 seconds at 56.6Kbps
--
::
--
Crusher and Hilfiker Wall construction
206 KB, approx. 39 seconds at 56.6Kbps
--
::
--
Conveyors 1 and 2
214 KB, approx. 41 seconds at 56.6Kbps
--
::
--
Fuel storage area
172 KB, approx. 33 seconds at 56.6Kbps
--
::
--
Stopemaster Longhole Drill Prep
218 KB, approx. 42 seconds at 56.6Kbps
--
::
--
Stopemaster Longhole Drill Prep
231 KB, approx. 44 seconds at 56.6Kbps
--
::
--
Unloading LH Drill
81 KB, approx. 16 seconds at 56.6Kbps
--
::
--
MAX unloading Diamond Drill
204 KB, approx. 39 seconds at 56.6Kbps
--
::
--
MAX Dam Construction
240 KB, approx. 46 seconds at 56.6Kbps
--
::
--
MAX Dam construction materials testing
268 KB, approx. 51 seconds at 56.6Kbps
--
::
--
MAX Crusher transfer tower assembly
291 KB, approx. 55 seconds at 56.6Kbps
--
::
--
MAX Adit #2 Drill Jumbo
295 KB, approx. 56 seconds at 56.6Kbps
--
::
--
MAX Crusher and Mill construction
255 KB, approx. 48 seconds at 56.6Kbps
--
::
--
MAX Mill Coffee break
219 KB, approx. 42 seconds at 56.6Kbps
--
::
--
Frank O'Grady & Scott Broughton @ Max UG Workshop - June 18
158 KB, approx. 30 seconds at 56.6Kbps
--
::
--
MAX Twin Portals
166 KB, approx. 32 seconds at 56.6Kbps
--
::
--
MAX Tailings Facility
133 KB, approx. 26 seconds at 56.6Kbps
--
::
--
MAX Tailings Facility construction
138 KB, approx. 27 seconds at 56.6Kbps
--
::
--
MAX Tailings area spillway
151 KB, approx. 29 seconds at 56.6Kbps
--
::
--
Max Stockwork June 18 022
169 KB, approx. 32 seconds at 56.6Kbps
--
::
--
MAX Portals and mine office
174 KB, approx. 33 seconds at 56.6Kbps
--
::
--
MAX Mill, Crusher and office
154 KB, approx. 30 seconds at 56.6Kbps
--
::
--
MAX Crusher Conveyors Assembly
172 KB, approx. 33 seconds at 56.6Kbps
--
::
--
MAX Mill Genset Commissioning
62 KB, approx. 13 seconds at 56.6Kbps
--
::
--
MAX Mine Office
94 KB, approx. 19 seconds at 56.6Kbps
--
::
--
MAX Electrical work on flotation floor
335 KB, approx. 1 minute, 3 seconds at 56.6Kbps
--
::
--
MAX Fine Ore Bin
84 KB, approx. 17 seconds at 56.6Kbps
--
::
--
MAX Flotation equipment completion
81 KB, approx. 16 seconds at 56.6Kbps
--
::
--
MAX Mill and Powerhouse construction
99 KB, approx. 19 seconds at 56.6Kbps
--
::
--
Grinding Floor Compaction
67 KB, approx. 14 seconds at 56.6Kbps
--
::
--
Fine Ore Bin assembly
73 KB, approx. 15 seconds at 56.6Kbps
--
::
--
Fine Ore Bin assembly
74 KB, approx. 15 seconds at 56.6Kbps
--
::
--
Thickener Floor
78 KB, approx. 15 seconds at 56.6Kbps
--
::
--
Mill construction
116 KB, approx. 23 seconds at 56.6Kbps
--
::
--
Flotation cells installed
74 KB, approx. 15 seconds at 56.6Kbps
--
::
--
Flotation cell assembly 2
78 KB, approx. 16 seconds at 56.6Kbps
--
::
--
Flotation cell assembly 1
80 KB, approx. 16 seconds at 56.6Kbps
--
::
--
Flotation agitators
73 KB, approx. 15 seconds at 56.6Kbps
--
::
--
Fine ore bin assembly
62 KB, approx. 13 seconds at 56.6Kbps
--
::
--
Cone crusher
75 KB, approx. 15 seconds at 56.6Kbps
--
::
--
Millwrights aligning No2 mill bearings MAY07
137 KB, approx. 27 seconds at 56.6Kbps
--
::
--
Mill steel work MAY07
178 KB, approx. 34 seconds at 56.6Kbps
--
::
--
Crusher Bin and feeder support MAY07
121 KB, approx. 24 seconds at 56.6Kbps
--
::
--
Mine Rescue Equpment Training Graham Seal-Jones MAY07
96 KB, approx. 19 seconds at 56.6Kbps
--
::
--
Worker Preparing MAX Mill for Roof Cladding
288 KB, approx. 55 seconds at 56.6Kbps
--
::
--
Mill steel work APR07
549 KB, approx. 1 minute, 43 seconds at 56.6Kbps
--
::
--
Mill concentrate loadout
544 KB, approx. 1 minute, 42 seconds at 56.6Kbps
--
::
--
Crusher development APR07
376 KB, approx. 1 minute, 11 seconds at 56.6Kbps
--
::
--
UG Surveying Apr 07
157 KB, approx. 30 seconds at 56.6Kbps
--
::
--
Rock Dump Apr 07
104 KB, approx. 20 seconds at 56.6Kbps
--
::
--
Mill Building Apr 07
210 KB, approx. 40 seconds at 56.6Kbps
--
::
--
Mill Building Apr 07
205 KB, approx. 39 seconds at 56.6Kbps
--
::
--
High Grade Stockpile Apr 07
196 KB, approx. 38 seconds at 56.6Kbps
--
::
--
MAX Plant Site and Tailings area
171 KB, approx. 33 seconds at 56.6Kbps
--
::
--
MAX Plant Site
189 KB, approx. 36 seconds at 56.6Kbps
--
::
--
MAX Crusher steel assembly
115 KB, approx. 22 seconds at 56.6Kbps
--
::
--
Rock Dump
65 KB, approx. 13 seconds at 56.6Kbps
--
::
--
Crusher
54 KB, approx. 11 seconds at 56.6Kbps
--
::
--
MAX mill construction John Mirko and Mike VVI
136 KB, approx. 26 seconds at 56.6Kbps
--
::
--
MAX ball mill construction
158 KB, approx. 31 seconds at 56.6Kbps
--
::
--
John Mirko and Doug Fosbrooke at MAX cone crusher
147 KB, approx. 28 seconds at 56.6Kbps
--
::
--
Mill Mar 4, 2007
94 KB, approx. 19 seconds at 56.6Kbps
--
::
--
Jaw Crusher Placed
44 KB, approx. 9 seconds at 56.6Kbps
--
::
--
Jaw Crusher Lift
46 KB, approx. 10 seconds at 56.6Kbps
--
::
--
Cone Mantle Placed
32 KB, approx. 7 seconds at 56.6Kbps
--
::
--
Ball Mill Placed
70 KB, approx. 14 seconds at 56.6Kbps
--
::
--
Flotation Floor
76 KB, approx. 15 seconds at 56.6Kbps
--
::
--
Gensets Placed
39 KB, approx. 8 seconds at 56.6Kbps
--
::
--
Max Mill Steel Riggers
97 KB, approx. 19 seconds at 56.6Kbps
--
::
--
Max Mill Steel
66 KB, approx. 13 seconds at 56.6Kbps
--
::
--
Max Mill Flotation Section
97 KB, approx. 19 seconds at 56.6Kbps
--
::
--
Max Mill Building
87 KB, approx. 17 seconds at 56.6Kbps
--
::
--
MAX Underground Decline Development Muck 19FEB07
132 KB, approx. 26 seconds at 56.6Kbps
--
::
--
MAX Mill Steel Work 19FEB07
63 KB, approx. 13 seconds at 56.6Kbps
--
::
--
MAX Mill Steel Work 19FEB07
60 KB, approx. 12 seconds at 56.6Kbps
--
::
--
MAX Mill Steel Work 19FEB07
57 KB, approx. 12 seconds at 56.6Kbps
--
::
--
MAX underground lunchroom 19FEB07
109 KB, approx. 21 seconds at 56.6Kbps
--
::
--
MAX Mill Roof Trusses 18FEB07
116 KB, approx. 23 seconds at 56.6Kbps
--
::
--
MAX Mill Roof Trusses 18FEB07
122 KB, approx. 24 seconds at 56.6Kbps
--
::
--
MAX Crusher building concrete 16FEB07
93 KB, approx. 18 seconds at 56.6Kbps
--
::
--
MAX Mill flotation floor assembly 16FEB07
99 KB, approx. 20 seconds at 56.6Kbps
--
::
--
MAX Mill Steel 17FEB07
139 KB, approx. 27 seconds at 56.6Kbps
--
::
--
MAX Crusher building concrete 16FEB07
93 KB, approx. 18 seconds at 56.6Kbps
--
::
--
Ball Mill Bearing
78 KB, approx. 16 seconds at 56.6Kbps
--
::
--
MAX Mill Steel Erection 13FEB07
96 KB, approx. 19 seconds at 56.6Kbps
--
::
--
MAX Ball mill unloading FEB07
124 KB, approx. 24 seconds at 56.6Kbps
--
::
--
MAX Ball mill installation Feb 07
93 KB, approx. 18 seconds at 56.6Kbps
--
::
--
MAX Thickener Steel
76 KB, approx. 15 seconds at 56.6Kbps
--
::
--
MAX Mill Steel Erection
88 KB, approx. 17 seconds at 56.6Kbps
--
::
--
MAX Mill Steel Work
90 KB, approx. 18 seconds at 56.6Kbps
--
::
--
MAX Steel Column Base Grinding
63 KB, approx. 13 seconds at 56.6Kbps
--
::
--
MAX Steel Crews Sorting Roof Trusses
142 KB, approx. 27 seconds at 56.6Kbps
--
::
--
Windsor Hotel Trout Lake 1950s
43 KB, approx. 9 seconds at 56.6Kbps
--
::
--
Windsor Hotel at Trout Lake 1950s
46 KB, approx. 10 seconds at 56.6Kbps
--
::
--
Windsor hotel with coach 1890s
56 KB, approx. 11 seconds at 56.6Kbps
--
::
--
Windsor Hotel 2005
95 KB, approx. 19 seconds at 56.6Kbps
--
::
--
Windsor Hotel 1890s
46 KB, approx. 9 seconds at 56.6Kbps
--
::
--
Old Trout Lake House 1950s
57 KB, approx. 12 seconds at 56.6Kbps
--
::
--
MAX view from Portal
98 KB, approx. 19 seconds at 56.6Kbps
--
::
--
MAX Underground survey review
66 KB, approx. 13 seconds at 56.6Kbps
--
::
--
MAX Thickener Tank Assembly
39 KB, approx. 8 seconds at 56.6Kbps
--
::
--
MAX Temporary mine dump area
32 KB, approx. 7 seconds at 56.6Kbps
--
::
--
MAX Snow removal and road maintenance
70 KB, approx. 14 seconds at 56.6Kbps
--
::
--
MAX Portal area
35 KB, approx. 7 seconds at 56.6Kbps
--
::
--
MAX office and Ug genset
30 KB, approx. 7 seconds at 56.6Kbps
--
::
--
MAX Loading 10 ton cars Ug
120 KB, approx. 23 seconds at 56.6Kbps
--
::
--
MAX Lefthand Mill drive bearings
44 KB, approx. 9 seconds at 56.6Kbps
--
::
--
MAX Jumbo drilling safety bay
79 KB, approx. 16 seconds at 56.6Kbps
--
::
--
MAX Final crusher concrete work
50 KB, approx. 10 seconds at 56.6Kbps
--
::
--
MAX Engineers Heading Underground
33 KB, approx. 7 seconds at 56.6Kbps
--
::
--
MAX Camp
24 KB, approx. 5 seconds at 56.6Kbps
Previous All pages Next 1 2 3 4 5 6 7 8 9 in  columns