|
Placing Rockfill on North Dam 218 KB, approx. 42 seconds at 56.6Kbps |
|
Crusher and Hilfiker Wall construction 206 KB, approx. 39 seconds at 56.6Kbps |
|
Conveyors 1 and 2 214 KB, approx. 41 seconds at 56.6Kbps |
|
Fuel storage area 172 KB, approx. 33 seconds at 56.6Kbps |
|
Stopemaster Longhole Drill Prep 218 KB, approx. 42 seconds at 56.6Kbps |
|
Stopemaster Longhole Drill Prep 231 KB, approx. 44 seconds at 56.6Kbps |
|
Unloading LH Drill 81 KB, approx. 16 seconds at 56.6Kbps |
|
MAX unloading Diamond Drill 204 KB, approx. 39 seconds at 56.6Kbps |
|
MAX Dam Construction 240 KB, approx. 46 seconds at 56.6Kbps |
|
MAX Dam construction materials testing 268 KB, approx. 51 seconds at 56.6Kbps |
|
MAX Crusher transfer tower assembly 291 KB, approx. 55 seconds at 56.6Kbps |
|
MAX Adit #2 Drill Jumbo 295 KB, approx. 56 seconds at 56.6Kbps |