Roca Mines Inc.










Previous All pages Next 1 2 3 4 5 Page 6 7 8 9 in  columns
--
::
--
Placing Rockfill on North Dam
218 KB, approx. 42 seconds at 56.6Kbps
--
::
--
Crusher and Hilfiker Wall construction
206 KB, approx. 39 seconds at 56.6Kbps
--
::
--
Conveyors 1 and 2
214 KB, approx. 41 seconds at 56.6Kbps
--
::
--
Fuel storage area
172 KB, approx. 33 seconds at 56.6Kbps
--
::
--
Stopemaster Longhole Drill Prep
218 KB, approx. 42 seconds at 56.6Kbps
--
::
--
Stopemaster Longhole Drill Prep
231 KB, approx. 44 seconds at 56.6Kbps
--
::
--
Unloading LH Drill
81 KB, approx. 16 seconds at 56.6Kbps
--
::
--
MAX unloading Diamond Drill
204 KB, approx. 39 seconds at 56.6Kbps
--
::
--
MAX Dam Construction
240 KB, approx. 46 seconds at 56.6Kbps
--
::
--
MAX Dam construction materials testing
268 KB, approx. 51 seconds at 56.6Kbps
--
::
--
MAX Crusher transfer tower assembly
291 KB, approx. 55 seconds at 56.6Kbps
--
::
--
MAX Adit #2 Drill Jumbo
295 KB, approx. 56 seconds at 56.6Kbps
Previous All pages Next 1 2 3 4 5 Page 6 7 8 9 in  columns